Wi-Fi & Wired Internet
Wi-Fi & Wired Internet
Exclusive Supplier:Servifira
Safety Rules
Please carefully click here to read the Electrical Safety Rules before ordering additional electrical switchboards.
Double Deck Power
If you are building a Double Deck Stand and require electricity on the upper level please contact Servifira in order to make sure that the cables reach up to the required location.
UPS Availability
A limited number of UPS’s (Uninterruptible Power Supply) are available from Servifira to protect your equipment in the event of a temporary power cut, please contact Servifira for more information and prices.
24h Power Setup
Orders of additional power will be installed with a separate switchboard. Hence, if you need a 24-hour power supply you will have two different switchboards. Each switchboard will be clearly labelled to distinguish between daytime and 24h supplies.
Board Location Required
It is compulsory for any additional switchboards ordered to show a location in the online plan provided during the ordering process.
All available Internet Services are detailed in the Fira Store.
Please click here to read the Wireless Policy.
The Wi-Fi service provided by Fira Barcelona operates in the 5GHz spectrum only. Please refer to the technical specifications of your device and make sure it is compatible. If your device is not compatible, you will not be able to use the service. For instructions on how to find out if your devices are compatible with the 5GHz Wi-Fi service please click here.
Safety Rules
Please carefully click here to read the Electrical Safety Rules before ordering additional electrical switchboards.
Double Deck Power
If you are building a Double Deck Stand and require electricity on the upper level please contact Servifira in order to make sure that the cables reach up to the required location.
UPS Availability
A limited number of UPS’s (Uninterruptible Power Supply) are available from Servifira to protect your equipment in the event of a temporary power cut, please contact Servifira for more information and prices.
24h Power Setup
Orders of additional power will be installed with a separate switchboard. Hence, if you need a 24-hour power supply you will have two different switchboards. Each switchboard will be clearly labelled to distinguish between daytime and 24h supplies.
Board Location Required
It is compulsory for any additional switchboards ordered to show a location in the online plan provided during the ordering process.
Early Bird: 16 January 2026
Please note that by clicking on this link you will be redirected to a third party Event Vendor’s website. GSMA shall have no liability for payment, and the service requested will be directly provided by, invoiced by, and payable to, the Event Vendor. The Company should enquire as to the rates at which the services will be invoiced and any applicable Event Vendor Terms of Services for agreement prior to any order being concluded.
GSMA shall not be liable to the Company for any loss or damage suffered or incurred by the Company in connection with the provision of (or failure wholly or partly of) any services or goods provide by third parties in connection with the Event or the partner package including without limitation in relation to the provision of utilities freight shipment the transport and delivery of sponsorship and or exhibition material to the Venue, work undertaken by third party contractors (whether or not GSMA sub-contractors) and services provided by the Venue. The Company acknowledges that services provided by GSMA official or recommended contractors to the Company are the subject of a separate agreement between the Company and the contractor. Although Organizer shall use reasonable care in selecting official or recommended contractors, GSMA shall not be liable for any loss or damage suffered or incurred by the Company in connection with the provision of services to the Company by such contractors.
Safety Rules
Please carefully click here to read the Electrical Safety Rules before ordering additional electrical switchboards.
Double Deck Power
If you are building a Double Deck Stand and require electricity on the upper level please contact Servifira in order to make sure that the cables reach up to the required location.
UPS Availability
A limited number of UPS’s (Uninterruptible Power Supply) are available from Servifira to protect your equipment in the event of a temporary power cut, please contact Servifira for more information and prices.
24h Power Setup
Orders of additional power will be installed with a separate switchboard. Hence, if you need a 24-hour power supply you will have two different switchboards. Each switchboard will be clearly labelled to distinguish between daytime and 24h supplies.
Board Location Required
It is compulsory for any additional switchboards ordered to show a location in the online plan provided during the ordering process.