Rules & regulations

Floor Covering

Floor covering is compulsory. Floor coverings must be secured and maintained so that they do not cause a hazard. Exhibitors must take adequate precautions to protect the venue floor from damage.

  • Bolting, fixing, or screwing to the hall floor is prohibited
  • Paint or plaster must not be used on the floor
  • Only double-sided adhesive tape may be used to fix floor coverings, which must be removed at the end of the Event
  • All costs relating to damage or cleaning of the venue floor will be charged directly to the Exhibitor
  • Fitted carpets, other textile floor coverings and under-lay must comply with British Standards BS 4790 Spanish or M Class or European Standards - BS EN 13501. Documentary evidence or labelling is required
  • Mats shall be sunk, so they are flush with the floor of the stand