Rules & regulations
Maximum Floor Loading
The maximum floor loading capacity are as follows:
| Hall | max floor loading |
|---|---|
| Hall 1 | 3000kg/m2 |
| Hall 2 | 5000kg/m2 |
| Hall 3 | 5000kg/m2 |
| Hall 4 | 5000kg/m2 |
| Hall 5 | 3000kg/m2 |
| Hall 6 | 5000kg/m2 |
| Hall 7 | 3000kg/m2 |
| Hall 8.0 | 3500kg/m2 |
| Hall 8.1 | 1500kg/m2 |
*Any other area: Information on request.
Click here to see the floor loading on a map.
Please click here to contact servifira for any further information.
Special conditions apply to double deck stands in Hall 8.1:
- Point loads can only support up to 6000kg
- The minimum distance between columns has to be 400cm
- Base plates of 50x50cm are compulsory on double decker stand columns
- Take into account the load limits and dimensions of the goods lifts in Hall 8. Click here for full details
Safety Rules
Please carefully click here to read the Electrical Safety Rules before ordering additional electrical switchboards.
Double Deck Power
If you are building a Double Deck Stand and require electricity on the upper level please contact Servifira in order to make sure that the cables reach up to the required location.
UPS Availability
A limited number of UPS’s (Uninterruptible Power Supply) are available from Servifira to protect your equipment in the event of a temporary power cut, please contact Servifira for more information and prices.
24h Power Setup
Orders of additional power will be installed with a separate switchboard. Hence, if you need a 24-hour power supply you will have two different switchboards. Each switchboard will be clearly labelled to distinguish between daytime and 24h supplies.
Board Location Required
It is compulsory for any additional switchboards ordered to show a location in the online plan provided during the ordering process.